Park Geosynthetics home
Highways

Stable working platforms

Heavy-load support

Create firm access and operating surfaces for highway construction equipment and concentrated loads.

Discuss your project
06 / 07

Engineered for the conditions beneath every journey.

Reinforcement and cellular confinement improve the stiffness of working platforms by restraining granular fill and distributing concentrated pressure. The result is a more dependable surface for cranes, piling rigs, heavy trucks and temporary access.

Project value

What the system is designed to deliver.

01

Greater platform stability

02

Improved aggregate confinement

03

Reduced local deformation

04

Rapid construction access

Park highway systems

From assessment to installation

A disciplined, project-led approach.

01

Quantify equipment loads

Track, wheel and outrigger pressures inform the working-platform design.

02

Strengthen the platform

Confinement and reinforcement layers are combined with suitable granular fill.

03

Maintain field control

Installation and platform condition are reviewed as construction progresses.

Typical applications

Where this solution adds value.

01

Crane pads

02

Piling platforms

03

Temporary haul routes

04

Bridge construction zones