Highways
01 / 07Highway grade separation
Reinforced steep slopes
Create stable, space-efficient highway embankments where conventional shallow slopes are not practical.
Discuss your project01
Overview
Engineered for the conditions beneath every journey.
Park reinforced-soil systems combine engineered geosynthetic layers with compacted fill to form steep, dependable embankments. The system is configured around project geometry, soil conditions and the selected vegetated, stone or structural facing.
Project value
What the system is designed to deliver.
Faster, modular construction
Flexible fascia selection
Performance designed around site conditions
Park highway systems
From assessment to installation
A disciplined, project-led approach.
Understand the ground
Project geometry, foundation soils and loading conditions establish the design basis.
Engineer the reinforcement
Reinforcement type, length and vertical spacing are selected for the required stability.
Build in controlled lifts
Fill, reinforcement and facing are installed in a planned sequence with field quality checks.
Typical applications