Park Geosynthetics home
Highways

Building over weak soil

Embankment & ground improvement

Distribute embankment loads and create dependable construction platforms over variable subgrades.

Discuss your project
05 / 07

Engineered for the conditions beneath every journey.

High-strength reinforcement placed at the embankment base spreads imposed pressure across a wider area and supports controlled construction over low-strength ground. For piled solutions, reinforcement can also form part of an engineered load-transfer platform.

Project value

What the system is designed to deliver.

01

Improved bearing response

02

More uniform load transfer

03

Stable access for construction

04

Compatible with staged embankment work

Park highway systems

From assessment to installation

A disciplined, project-led approach.

01

Characterise the subgrade

Soil strength, settlement and groundwater conditions are reviewed before system selection.

02

Develop the platform

Reinforcement and granular layers are configured to distribute construction and permanent loads.

03

Monitor the build

Staging, placement and field response are checked against the project plan.

Typical applications

Where this solution adds value.

01

Soft-soil crossings

02

Piled embankments

03

Approach roads

04

Settlement-sensitive corridors