Park Geosynthetics home
Mining

Heavy-equipment support

Working platform stabilisation

Create level, dependable platforms for tracked plant, drilling rigs and processing equipment.

Discuss your project
03 / 03

Ground systems engineered for mining intensity.

Soft ground and variable fill can concentrate pressure beneath heavy tracked equipment and fixed plant. Park reinforced platform systems spread loads, confine granular material and moderate differential movement, supporting safer mobilisation and more predictable equipment response.

Project value

What the system is designed to deliver.

01

Improved stability margins

02

Reduced differential settlement

03

Earlier site mobilisation

04

Less reliance on imported fill

Park mining systems

From assessment to installation

A controlled engineering approach.

01

Quantify equipment pressure

Track, outrigger, vibration and static loads define platform demand.

02

Engineer load transfer

Reinforcement and confined granular layers distribute pressure over the subgrade.

03

Verify field condition

Level, material placement and platform performance are controlled during use.

Typical applications

Where this solution adds value.

01

Crawler-crane pads

02

Drilling and piling rigs

03

Stockpile zones

04

Crusher and plant foundations