Mining
02 / 03Extreme axle-load infrastructure
Mine haul roads
Stabilise weak subgrades and confine road-base materials under continuous mine traffic.
Discuss your project02
Overview
Ground systems engineered for mining intensity.
Mine haul roads carry exceptional axle loads, braking forces and repeated traffic across variable or saturated ground. Park separation, reinforcement and cellular confinement improve load distribution, limit aggregate movement and create a more serviceable running surface with fewer disruptive maintenance interventions.
Project value
What the system is designed to deliver.
Controlled rutting and profile loss
Efficient aggregate performance
Reduced maintenance disruption
Park mining systems
From assessment to installation
A controlled engineering approach.
Measure road demand
Truck loading, traffic, gradient, subgrade and drainage are assessed first.
Stabilise each layer
Separation, reinforcement and confinement are positioned for the governing mechanism.
Build for operations
Material placement and compaction create a consistent running platform.
Typical applications